Projects

Activities: Design Construction supervision
Region:
Status:
Project period:
  


Novo-Admiralteysky bridge across the Big Neva River in the alignment of Lines 16-17 and 18-19 Novo-Admiralteysky bridge across the Big Neva River in the alignment of Lines 16-17 and 18-19

The design of a new bridge to Vasiljevsky Island across the Big Neva River. The project realization has been postponed by economic reasons.
 
St. Petersburg Ring Road St. Petersburg Ring Road

The Ring Road is the first express highway in St. Petersburg, which allowed diverting transit traffic away from the city. Part of the road runs along the Flood Protection Barrier.

Stroyproekt developed the design of engineering structures and carried out construction supervision on several road sections and traffic interchanges.

 

 

Pages: Prev. 1 2 3 4 All