Statistics

Stroyproekt in figures

Annual turnover : RUB 10 000 million.

Number of designed engineering structures (bridges, overpasses, flyovers and tunnels) ~800 with a total length of over 200 km, including about 110 structures of more than 60 km long in St. Petersburg. 

The Western High Speed Diameter owns two records for one of the greatest length of bridge structures in Russia: the second place in terms of the length in Russia is the southern flyover of the main way with the bridges across the Sea Channel and Korabelny Fairway - 9378 meters and the third place in terms of the length is the northern flyover of the main way with the bridges across the Petrovsky Canal and Elagin Fairway - 8794 meters

Total number of the Engineering Group personnel: 1500, 43 our employees have PhD and DSc degrees in various disciplines

Institute Stroyproekt is among the TOP 150 of international design companies (The Top 150 Global Design Firms) according to Engineering News-Record

Stroyproekt is in the lead of TOP-3 technical consultants for concession projects