Novosibirsk | Ob River Crossing – Bugrinsky Bridge in Novosibirsk |
Sochi. | Back-up of Kurortny Prospect, 3 stage |
St. Petersburg (reconstruction)
Design and Detail Design Development
Project period: 2004 –
2011
General Designer: Institute Stroyproekt JSC
Client: Committee for City Improvement and Road Infrastructure of St. Petersburg Administration
Main technical parameters of the traffic junction:
– total length: 275.446 m
– width of the semi-tunnel: 11.5 m
– foundations of reinforced concrete piles with diameter of 0.6 m and a length of up to 30 m
– semi-tunnel structure of cast-in-situ reinforced concrete 0.31 m thick.
The Project also included reconstruction of the exit ramps from Academician Lebedev Street to Arsenalnaya and Pirogovskaya Embankments; the ramps have been widened to 7 m and are now two-way traffic.