Expressway Highway M-12 Vostok

Expressway Highway M-12 Vostok

Moscow, Nizhny Novgorod, Kazan
Design, detailed design
Project period: 2020 – Present
General Designer: Institute Stroyproekt AO
Client: Russian Highways State Company (AVTODOR).


The new highway is designed to divert transit traffic coming from the western Russian regions towards Nizhnekamsk and Naberezhnye Chelny, and further to Ufa, bypassing a congested road along the dam of Nizhnekamsk hydropower plant. The bypass includes a new bridge over the Kama near Kotlovka and Ilyinka.

Our engineers have developed and considered five route alternatives to choose the optimal one, both in technical and economic terms.

Вантовый с фресс Оранж_9 - 1.jpg

Technical parameters

  • Road category – IB 
  • Length – 80.5 km 
  • Lanes – 4 
  • Design speed – 120 km/h 
  • Interchanges — 5
  • Engineering road structures — 25
  • Bridge over the Kama - 1377 m

The bridge over the Kama is the longest structure of the bypass. 

Technical parameters

  • Total length of the bridge crossing – 1.3 km 
  • Length of the main bridge – 792 m 
  • Navigation clearance – 2х150 m 
  • Number of piers – 22

A BIM model has been developed for the project. 

<
M-12 Vostok opens to traffic 22.12.2023 M-12 Vostok opens to traffic

At the video conference on 21 December, President Putin launched traffic at the M-12 section between Moscow and Kazan.

 
 
The M-12 Vostok Highway Stage 1 to 4 Project was announced as the best federal infrastructure project 16.11.2023 The M-12 Vostok Highway Stage 1 to 4 Project was announced as the best federal infrastructure project

On November, 14, the winners of the 10th Formula of Motion national award for achievements in transportation and transport infrastructure were announced at the Transport Week forum in Moscow. 

 
 

 