Novosibirsk | Ob River Crossing – Bugrinsky Bridge in Novosibirsk |
Sochi. | Back-up of Kurortny Prospect, 3 stage |
Moscow, Tver, Novgorod, Leningrad Regions, St. Petersburg (new construction)
Design, detailed design, construction supervision
Project period: 2008 –
2020
General Designer: Institute Stroyproekt JSC
Client: Russian Highways State Company
Description
The M-11 Neva toll expressway between Moscow and St. Petersburg is one of the largest infrastructure projects in Russia. It is a much-needed congestion reliever of the M-10 motorway. The new road bypasses all populated areas in Moscow, Tver, Novgorod and Leningrad Regions.
Construction of the expressway allowed decreasing the traffic and reducing accident rate on the M-10. Travel from Moscow to St. Petersburg takes now 6-7 hours.
Stroyproekt developed the design and detail design of several M-11 sections, as well as the design of large and non-standard bridges, overpasses and flyovers for the whole road. Our company also performed construction supervision for Stages IV and V.
Technical parameters
Total length — 669 km
Design speed — 150 km/h
Lanes — 4–10
Road sections designed — 9
Scope of Work
Moscow section, km 15 — km 58
Detailed design.
Section km 58 — km 97, Stage I
Design of the bridges across the Istra and Lipnya Rivers, detailed design for the road section construction.
Section km 97 — km 149, Stage II
Design of the bridge across the Yamuga River and construction organization plan for the bridge across the Shosha River.
Section km 149 — km 208, Stage III
Design of the bridges across the Volga and Tvertsa Rivers.
Section km 208 — km 258, Stage IV
Construction supervision.
Section km 258 — km 334, Stage V
Construction supervision.
Design and detailed design of the bridges across the Tvertsa, Shlina and Tsna Rivers.
Section km 334 — km 543, Stage VI
Main Designer (design and detailed design).
Section km 543 — km 646, Stage VII
Design of the bridge across the Pitba River, overpass across the M-10 highway, overpass across Chudovo-Novgorod railway.
Area and landscape design for the Great Patriotic War memorial at km 561.
Section km 646 — km 684, Stage VIII
Design of the bridge across the Izhora River and three overpasses.
Detailed design of the bridge across the Izhora River, the overpass across Chudovo-Novgorod railway, KAD Ring Road overpasses, Toll Plaza at km 679, Traffic Control Centre with Toll plaza at km 647, road tunnel at the intersection with the railway to Warsaw.
![]() |
03.07.2020
Memorial to the fatherland defenders opened on the M-11 Neva Express Motorway The Memorial built on the M-11 Neva Express Motorway (at 561 km) was opened on 28 June 2020, to commemorate the 75th anniversary of the victory in the Great Patriotic War. |
| |
![]() |
27.11.2019
The last stage of the M-11 express toll highway Moscow - St. Petersburg opens to traffic On November 27, Stage 8 of the M-11 express toll highway Moscow - St. Petersburg opened to traffic. The opening ceremony was attended by the President of the Russian Federation Vladimir Putin. |
| |
![]() |
14.09.2017
Photo Report on Construction of Express Toll Highway Moscow-St. Petersburg, Stage 4 A 50-km road section from km 208 to km 258 is being constructed in Tver Region. All 26 engineering structures that are part of the road are close to completion. |
| |
![]() |
11.11.2016
Stroyproekt goes on designing the express toll highway Moscow – St. Petersburg Stroyproekt has signed a detailed design contract for the road section km 58 – km 97. |
| |
![]() |
24.12.2014
Photo Report on Moscow – St. Petersburg highway section 15km – 58km opening ceremony |
|