Novosibirsk | Ob River Crossing – Bugrinsky Bridge in Novosibirsk |
Sochi. | Back-up of Kurortny Prospect, 3 stage |
Ashkhabad / Turkmenistan (new construction)
Project period: 2011 –
2014
General Designer: Stroyproect AO
Client: Vozrozhdeniye, JSC PO
Extension of the “10 years of Prosperity” Street from Bitarap Turkmenistan Prospect to Bekrevin Highway
– length – 4,2 км
– lanes: 4+4 main lanes and 4 side driveway lanes (2 in each direction)
Ailav Highway section from Saparmurad Turkmenbashi Prospect to Ashkhabad – Gyami HighwaySection of the Ring Road from Bekrevin Highway to the intersection of Andalib Street with Ailav Highway
– length– 7,7 км
– lanes– 3+3
The project includes 3 overpasses.
The architectural solutions developed by Institute Stroyproekt for Ashkhabad projects are based on national Turkmen motifs.
JSC Novgorodstroyproekt was also involved into the design development.
The design was developed for JSC PO “Vozrozhdeniye”.