Multilevel Interchange in Krasnodar

Multilevel Interchange in Krasnodar

Krasnodar (new construction)
Design
Project period: 2013 – 2015
General Designer: Institute Stroyproekt
Client: Krasnodar Region Motor Road Department


The new 4-level interchange in the centre of Krasnodar ensures smooth traffic through Stavropolskaya and Starokubanskaya Streets including tram operation in Stavropolskaya Street.

The design also provides for comfortable public transport traffic.

The architectural solution includes the roundabout deck fixed to four pylons by means of stay cables. The pylon tops are connected with each other in a ‘bicycle wheel’ system. Aesthetic lighting at dark makes the roundabout look soaring and gleaming in the air.

Technical parameters

Flyover length in Starokubanskaya Street — 360 m

Total length — 544 m

Lanes — 4

Ramp length at Starokubanskaya Street — 562.9 m

Lanes — 4+2 tram tracks


 

Возврат к списку