Anapa Bypass: A-290 highway, section km 47 — km 52

Anapa Bypass: A-290 highway, section km 47 — km 52

Krasnodar Region (new construction)
Design, detailed design
Project period: 2015 – Present
General Designer: Institute Stroyproekt
Contractor: DSK LLC
Client: Federal Road Administration Chernomorye


The bypass road is designed for transit vehicles and shall thereby improve the traffic situation within the resort city of Anapa and its outskirts.

The project comprises construction of a 13.5km-long highway bypassing some settlements, and three traffic interchanges with local roads Krasnodar Region.

Обход Анапы3_cr.jpg

Technical parameters

Designed speed — 120 km/h

Highway category — IB

Interchanges — 3

Overpasses — 5

Culverts — 36

Main features

In line with the patented design by Institute Stroyproekt, deck structures of the overpasses are modified reinforced concrete beams with cast-in-situ carriageway slabs.


 

Возврат к списку