Construction of the A-290 highway interchange (km 73)

Construction of the A-290 highway interchange (km 73)

Krasnodar Region (сonstruction, reconstruction)
Design, detailed design
Project period: 2013 – 2018
General Designer: Institute Stroyproekt
Contractor: DSK LLC
Client: Federal Road Administration Chernomorye


The interchange is designed to separate local and transit traffic flows and to increase the highway capacity by reducing traffic congestion. As a result, transport accessibility of the Black Sea coast will significantly improve.

Technical parameters

Length — 3442 m

Highway category — IB

Lanes — 4

Total length of the interchange ramps — 2467 m

Overpasses — 2

Culverts — 4

Designed speed — 120 km/h


 