Novosibirsk | Ob River Crossing – Bugrinsky Bridge in Novosibirsk |
Sochi. | Back-up of Kurortny Prospect, 3 stage |
Krasnodar Region (сonstruction, reconstruction)
Design, detailed design
Project period: 2013 –
2018
General Designer: Institute Stroyproekt
Contractor: DSK LLC
Client: Federal Road Administration Chernomorye
Description
The interchange is designed to separate local and transit traffic flows and to increase the highway capacity by reducing traffic congestion. As a result, transport accessibility of the Black Sea coast will significantly improve.
Technical parameters
Length — 3442 m
Highway category — IB
Lanes — 4
Total length of the interchange ramps — 2467 m
Overpasses — 2
Culverts — 4
Designed speed — 120 km/h