Novosibirsk | Ob River Crossing – Bugrinsky Bridge in Novosibirsk |
Sochi. | Back-up of Kurortny Prospect, 3 stage |
Krasnodar Region (construction and reconstruction)
Design, detailed design
Project period: 2013 –
2018
General Designer: : Institute Stroyproekt
Contractor: DSK LLC
Client: Federal Road Administration Chernomorye
Description
Construction and reconstruction works on the highway are part of the national project — Comprehensive Plan for Modernisation and Expansion of Trunk Infrastructure for the period to 2024.
Technical parameters
Length — 18.4 km
Highway category — IB
Lanes — 4
Engineering structures — 52
Interchanges — 2
Designed speed — 120 km/h
Main features
In line with the patented design by Institute Stroyproekt, continuous deck structures of the overpasses are modified reinforced concrete beams with cast-in-situ carriageway slabs. The beams are of I-section, reinforced with prestressed tendons.