Yakutsk (rehabilitation project)
Project period: 2014 –
2018
General Designer: Project Engineer - AO Institute Stroyproekt
Client: OAO "Vodokanal" Jakutsk City
The project includes five contracts to be supervised by the Project Engineer:
1. Construction of Water Intake and Water Treatment Plant;
2. Construction of Chlorine Based Disinfection Facilities;
3. Modernization of Pumping Stations;
4. Supply and Installation of Water Meters;
5. Introduction of SCADA System (supervisory control and data acquisition system).
Stroyproekt is responsible for contracts supervision and performs the duties of the Project Engineer as specified in the FIDIC Conditions of Contract for Plant Design and Build (the “Yellow Book”).