Novosibirsk | Ob River Crossing – Bugrinsky Bridge in Novosibirsk |
Sochi. | Back-up of Kurortny Prospect, 3 stage |
Astana / Kazakhstan (repairs) Design (architectural concept) Project period: 2013 – 2014 Client: Committee for Passenger Transport and Motorways Management of Astana City Administration
Project period: 2013 –
2013
Astana / Kazakhstan (repairs)
Design (architectural concept)
Project period: 2013 – 2013
Client: Committee for Passenger Transport and Motorways Management of Astana City Administration
Main parameters:
Bridge at Saryarka prospect is a 215 m long and 33 m wide three-span steel beam bridge with polygonal bottom chord (6 traffic lanes);
M-2 bridge is a 362 m long and 39 m wide seven-span beam bridge, including a continuous three-span central section and 2 concrete end spans at either side (6 traffic lanes).