Project period: –
Present
General Designer: Institute Stroyproekt AO
Client: FKU DSD Center
The reconstructed road sections run across dense residential areas and intersect the existing road and street network of Moscow Region.
Section at km 16 – km 20 (Start-up complex No 3)
– Total length: 3.4 km
– Road category: 1-B;
– Number of lanes: 10
The project includes: 1 traffic interchange, 1 turning flyover, overhead pedestrian crossings.
Section at km 22 – km 29. Start-up complex No 2 (By-pass of Tarasovka)
– Total length: 7.4 km
– Road category: 1-B
– Number of lanes: 10
The project includes: 3 traffic interchanges, 9 bridges and overpasses, overhead pedestrian crossings.
In 2007-2008 Stroyproekt executed construction control at the Project Section between km 20 and km 22+100 (Start-up complex No. 2). This Section includes: