M-8 Kholmogory Motorway

M-8 Kholmogory Motorway

Moscow Region (reconstruction)
Project period: – Present
General Designer: Institute Stroyproekt AO
Client: FKU DSD Center


The reconstructed road sections run across dense residential areas and intersect the existing road and street network of Moscow Region.

Section at km 16 – km 20 (Start-up complex No 3)
 – Total length: 3.4 km
 – Road category: 1-B;
 – Number of lanes: 10

The project includes: 1 traffic interchange, 1 turning flyover, overhead pedestrian crossings.

Section at km 22 – km 29.  Start-up complex No 2 (By-pass of Tarasovka)
 – Total length: 7.4 km
 – Road category:  1-B
 – Number of lanes: 10

The project includes: 3 traffic interchanges, 9 bridges and overpasses, overhead pedestrian crossings.

In 2007-2008 Stroyproekt executed construction control at the Project Section between km 20 and km 22+100 (Start-up complex No. 2). This Section includes:
– bridge across the Yauza River, 40.86 m long (27.25+3+31 m)
– overpass across Yaroslavl motorway (Olimpiysky Prospect), 202.6 m long (1.50+10.5+0.75+10.25+1.50 m)
– flyover-overpass at Ramp 1 (Pionerskaya Street), 426.86 m long (the flyover part is 84.36 m)
– flyover-overpass at Ramp 4, 304.21 m long
– 5 pedestrian crossings with total length of 1174.1 m.



<

 