Bridge across the Samara River

Bridge across the Samara River

Samara (new construction)
Design
Project period: 2009 – 2012
Client: Government of Samara Region; Ministry of Transport, Communications and Roads of Samara Region


Main technical parameters of the Samara River crossing:

 – length of the bridge: 667 m
 – bridge layout: 33+(120+135+85+135+120)+29 m
 – number of lanes: 3+3
 – depth of the trussed beam: 20 m
 – bridge underclearance: 2(24х120 )m.

The project includes also a bridge across Bannoye Lake (80 m long), an overpass (71 m long) and 2 traffic interchanges.




<

 

Возврат к списку