Bridge across the Sochi River

Bridge across the Sochi River

Sochi (new construction)
Design, Detail Design Development, Construction Control
Project period: 2008 – 2014
General Designer: Institute Stroyproekt JSC
Client: Federal Highway Agency Directorate for Construction and Reconstruction of Motor Roads of the Black Sea Coast


Main technical parameters of the structure:

 – length of the bridge: 244.6 m
 – length of the central span: 75 m
 – width of the bridge: (at the straight section): 27.7 m.

Development of Sochi road infrastructure for the 2014 Winter Olympics become one of the main activities of JSC Institute Stroyproekt over those years.

The design of Olympic Projects allowed for extremely complicated conditions: mountainous relief, seismic risks (including unstable soil), existing urban development and strict requirements to environment protection.



<

 

Возврат к списку