Novosibirsk | Ob River Crossing – Bugrinsky Bridge in Novosibirsk |
Sochi. | Back-up of Kurortny Prospect, 3 stage |
On November, 29, the winners of the Best Project 2017 Competition organized by National Association of Researchers and Designers (NOPRIZ) received their awards in Moscow.
NOPRIZ President Mikhail Posokhin welcomed the participants of the award ceremony and stated that this year about 120 design companies from eight Russian federal regions and companies from Armenia, Kazakhstan and Kyrgyzstan took part in the competition.
The expert jury evaluated the projects using the following criteria:
• Innovation
• Quality
• Original architectural and engineering solutions
• Sustainability
• Environment protection
The jury was unanimous in announcing the Western High Speed Diameter Project to be the winner of the nomination “The best engineering and transport infrastructure project”.
Our congratulations to the whole team of Stroyproekt Engineering Group!
![]() |
Western High Speed Diameter (WHSD) Description
WHSD is the first urban toll expressway in St. Petersburg, 46.6 km in length, which comprises a great number of complex engineering structures. The road links the southern and western city districts with the Ring Road, Vasilievsky Island in the center and the Scandinavia highway in the north, and has improved accessibility of the main transport hubs — Pulkovo Airport, the port of St. Petersburg and the Marine Façade passenger terminal. The new expressway has reduced travel times in some city areas by 50-70%.
WHSD features the second and the third longest bridge structures in Russia — Southern mainline flyover with the bridges over the Sea Channel and Korabelny Fairway, 9378 m long, and Northern mainline flyover with the bridges over Petrovsky Fairway and Elagin Fairway, 8794 m long.
|
|