М-4 Don Motorway

М-4 Don Motorway

Voronezh Region, Rostov Region (reconstruction)
Design, Detailed Design Development
Project period: 2008 – Present
General Designer: Institute Stroyproekt AO (for sections 877 km – 907 km, 933 km –1024 km and 1024 km – 1091 km )


Section 633 km –715 km (by-pass of Losevo and Pavlovsk towns)
Voronezh Region
Main parameters:
 – Length: 84 km
 – Category: 1-А
 – Number of lanes – 4
The project includes: 3 traffic interchanges, 36 bridges and flyovers.

Section 877 km –907 km (By-pass of Tarasovsky)
Rostov Region
 – Length: 30.7 km
 – Category: 1-Б
 – Number of lanes: 4
The project includes: 4 traffic interchanges, 7 bridges and flyovers, 2 overhead pedestrian crossings.

Section 933 km –1024 km
Rostov Region
 – Length: 91.7 km
 – Category: 1-А
 – Number of lanes: 4–6
The project includes: 7 traffic interchanges, 21 bridges (bridges and flyovers).

A comparative analysis of Russian and German road design standards was performed during development of design documentation for reconstruction of this road section to be subsequently operated on a fee basis.

The work has been implemented in cooperation with a German company BEB at the initiative and support of the Client, Russian Ministry of Transport and State Company AVTODOR.

The design has been developed simultaneously according to the Russian and German standards. This allowed choosing the most optimal design solutions for the project. The results of such design experience may be the basis for development of amendments and revisions of the Russian road design standards including their harmonization with the European codes.

Section 1024 km –1091 km
Rostov Region
–– Length: 62 km
–– Category: 1-А
–– Number of lanes: 4–6
The project includes: 4 traffic interchanges, 32 bridges (bridges and flyovers).







M-4 road section opened to traffic in Rostov Region 22.05.2017 M-4 road section opened to traffic in Rostov Region

The opening ceremony took place on 19 May. The ceremony was attended by Vice-Speaker of the Council of the Federation Evgeny Bushmin, Minister of Transport Maxim Sokolov, Governor of Rostov Region Vasily Golubev, Chairman of the Avtodor Board Sergei Kelbakh and the top managers of the main design company – Aleksei Zhurbin, the General Director of Institute Stroyproekt and Alexander Kusik, the Director of Stroyproekt Rostov Office.

 
 
Expert review authority’s approval received for the radiometric control station project on the M-4 Don highway 21.03.2017 Expert review authority’s approval received for the radiometric control station project on the M-4 Don highway

The positive opinion by the expert review authority was received for the design documentation, engineering survey results and cost estimates.

 
 
Stroyproekt Engineering Group news. Moscow branch. State Expert Review Authority approval obtained for the M-4 “Don” Project. 16.08.2016 Stroyproekt Engineering Group news. Moscow branch. State Expert Review Authority approval obtained for the M-4 “Don” Project.

Construction of the road section from 993 to 1024 km in Rostov Region is a first pilot project in Russia aimed at harmonization of Russian and Western engineering standards.

 
 
Construction of Usman bypass at the M-4 Don highway started 25.06.2014 Construction of Usman bypass at the M-4 Don highway started

Specialists of Stroyproekt Construction Supervision Division will supervise construction works for the Usman bypass section between 517 km and 544 km.
 
 
Aksai Eastern Bypass project meeting held in Rostov-on-Don 23.06.2014 Aksai Eastern Bypass project meeting held in Rostov-on-Don

The road design is almost complete
 
 

 

Возврат к списку