Statistics

Stroyproekt in figures

Annual turnover (2016): RUB 6 600 million

Number of designed engineering structures (bridges, overpasses, flyovers and tunnels) ~800 with a total length of over 200 km, including about 110 structures of more than 60 km long in St. Petersburg. 

The Western High Speed Diameter owns two records for the greatest length of bridge structures in Russia:

 1. The longest bridge structure in Russia is the southern flyover of the main way with the bridges across the Sea Channel and Korabelny Fairway - 9378 meters.
 2. The second place in terms of the length is the northern flyover of the main way with the bridges across the Petrovsky Canal and Elagin Fairway - 8794.475 meters.

Total number of the Engineering Group personnel (September 2017): 1593 employees, including

St. Petersburg Office Institute Stroyproekt: 586 employee

Moscow Branch Institute Stroyproekt: 119 employees

Rostov Branch Institute Stroyproekt: 88 employees

Astana Branch Institute Stroyproekt: 1 employe

Peterburgskie Seti ZAO: 138 employees

Institute Proektmostrekostruktsia OOO:  120 employees

Novgorodstroyproekt ZAO: 86 employees

OOO Institute Tunnelstroyproekt: 78 employees

Representation office in Novosibirsk: 3 employees

STPR ConsultingGmbH: 2 employees

OOO Institute Transport Intelligent Systems: 80 employees.

  31 our employees have PhD and DSc degrees in various disciplines

Institute Stroyproekt is among the TOP 150 of international design companies (The Top 150 Global Design Firms) according to Engineering News-Record.