Projects

Activities: Design Construction supervision
Region:
Status:
Project period:
  


Velizh Bypass road in Smolensk Region Velizh Bypass road in Smolensk Region

The project provides for arranging transit traffic on the R133 Olsha – Nevel motorway to bypass the city of Velizh. The project includes rehabilitation of the existing R133 road section and construction of a new road section with a bridge over the Western Dvina River.
The project will be implemented in 2 phases.
 
Yakutsk Water Modernisation Project Yakutsk Water Modernisation Project

The European Bank for Reconstruction and Development has provided a senior loan to OJSC Vodokanal, a public utility enterprise responsible for the provision of water supply and wastewater services in the City of Yakutsk, the capital of the Republic of Sakha.  The Project funds will be used to co-finance the priority investment programme aimed at rehabilitation and modernisation of the water intake and water supply systems.

 
Construction of Lytkarino – Tomilino – Kraskovo – Zheleznodorozhny Motorway Construction of Lytkarino – Tomilino – Kraskovo – Zheleznodorozhny Motorway

Section 0 km – 24 km. Stroyproekt has been developing the area planning design.
 
Construction of a ramp flyover in Sochi Construction of a ramp flyover in Sochi

The project site peculiarities that influenced the design solutions include an extremely confined space due to the existing municipal and Adler railway station utilities.

 
The Volga River Bridge Project in Volgograd, Sections 2, 3 and 4 The Volga River Bridge Project in Volgograd, Sections 2, 3 and 4

The new 1-B category express road accommodates 4 lanes. Its 14 km-long route runs through the territory of the Volga-Akhtuba National Park and crosses a large number of water bodies.

 
Far Western Krasnodar Bypass Far Western Krasnodar Bypass

A new 51km-long bypass road will run through three municipalities of Krasnodar Region and will have grade-separated interchanges with the existing railway and motor roads. The route will start at the junction with the federal highway M-4 Don and end at the junction with the federal highway A-289 between Krasnodar and the A-290 road Novorossiysk - Kerch.

 
Express highway with a new bridge over the Neva aligned with Fayansovaya and Zolnaya streets Express highway with a new bridge over the Neva aligned with Fayansovaya and Zolnaya streets

 
Transport facilities being part of Tyumen bypass Transport facilities being part of Tyumen bypass

Stroyproekt has been developing the design and detailed design for construction of transport facilities being part of Tyumen bypass in the south of the city of Tyumen.


 
Construction of Tyumen Eastern By-pass Section Construction of Tyumen Eastern By-pass Section

Stage 1 of Tyumen Eastern By-pass includes a new bridge across the Tura River and a grade-separated traffic interchange with an overpass at Dambovskaya Street and a retaining wall for the Tura River left bank protection.

 
Bridge crossing over the Irtysh River (Pavlodar Bypass – the Irtysh Bridge Crossing including river training works) Bridge crossing over the Irtysh River (Pavlodar Bypass – the Irtysh Bridge Crossing including river training works)

The new bridge ensured permanent traffic between the regional centre (the city of Pavlodar) and a mono-industrial town Aksu, and became a part of a large-scale state project for transport infrastructure development, namely construction of a 4-lane highway Astana - Pavlodar - Ust-Kamenogorsk linking Central Kazakhstan and neighbouring Russian regions.

 

Pages: Prev. 1 2 3 4 5 6 Next All