Novosibirsk | Ob River Crossing – Bugrinsky Bridge in Novosibirsk |
Sochi. | Back-up of Kurortny Prospect, 3 stage |
![]() |
Voroshilovsky Bridge across the Don River Reconstruction of the Don crossing including a non-standard bridge aligned with Voroshilovsky Prospect in Rostov-on-Don. |
![]() |
Traffic Interchange at the Intersection of Donskaya and Vinogradnaya Streets The interchange is an element of Sochi road infrastructure having been developed for the 2014 Winter Olympics. |
![]() |
Kurortny Prospect Alternative Road in Sochi Kurortny Prospect Alternative Road is one of the main transport infrustructure facilities built for the 2014 Olympics. The 16km-long motorway with tunnels, bridges and flyovers goes through the city centre and ensures uninterrupted traffic at 75 km/h. In 2016, the project won the award for Best Transport Infrustruture Project in the contest organised by the Russian Ministry of Construction, Housing and Utilities. |
![]() |
M-8 Kholmogory Motorway The reconstructed road sections run across dense residential areas and intersect the existing road and street network of Moscow Region. |
![]() |
Khabarovsk Bypass Description Khabarovsk Bypass is the first PPP transport project in the Russian Far East. This road provides a link between three federal highways — А-370 Ussuri, R-297 Amur and А-375 East. Implementation of the project will open new opportunities for developing transport infrastructure of the Russian Far East.
|
![]() |
Traffic Interchange “Stadium” This is a two-level traffic interchange at the intersection of Kurortny Prospect and the 20th Mountain Division Street. |
![]() |
M-11 Neva Express Motorway Description The M-11 Neva toll expressway between Moscow and St. Petersburg is one of the largest infrastructure projects in Russia. It is a much-needed congestion reliever of the M-10 motorway. The new road bypasses all populated areas in Moscow, Tver, Novgorod and Leningrad Regions. Construction of the expressway allowed decreasing the traffic and reducing accident rate on the M-10. Travel from Moscow to St. Petersburg takes now 6-7 hours. Stroyproekt developed the design and detail design of several M-11 sections, as well as the design of large and non-standard bridges, overpasses and flyovers for the whole road. Our company also performed construction supervision for Stages IV and V.
|
![]() |
Olympic Sochi Projects Development of Sochi road infrastructure for the 2014 Winter Olympics has become one of the main activities of JSC Institute Stroyproekt over the recent years. |
![]() |
Bridge across the Samara River The bridge will be one of the major transport links in Samara relieving the Southern and the Old bridges and will also ensure a connection to the Central Russia – Volga Region – the Urals motorway and a new residential district “Zariechie”. |
![]() |
Northern By-Pass of Pskov Northern By-Pass of Pskov (Second Start-up Complex) will connect the regional motorway Pskov – Gdov – Slantsy – Kingisepp – Kuzemkino – Krakolie with the А-212 Motorway Pskov – Izborsk – Estonian Border. |