Novosibirsk | Ob River Crossing – Bugrinsky Bridge in Novosibirsk |
Sochi. | Back-up of Kurortny Prospect, 3 stage |
24.01.2014
News from Novgorodstroyproekt: State Expertise positive conclusion is received for the Medvedka River Bridge Rehabilitation Project in Tver Region The bridge is located at 166+200 km of the local public motor road Tver-Ustyuzhna in Tver Region. The State Expertise has approved the engineering design and the cost estimate is still under consideration. |
|
16.01.2014
Stroyproekt takes part in the design of a bridge to Krestovsky Island in St. Petersburg The bridge crossing will pass over the Bolshaya Nevka River and Srednaya Nevka River mouth. The project parameters are still being refined. |
|
15.01.2014
The bridge at Serny Island: Designing resumed Stroyproekt, St. Petersburg has resumed development of design documentation for construction of a bridge over the Malaya Neva River near Serny Island in St. Petersburg. |
|
14.01.2014
Development of design documentation for a new project in Sochi has been started Stroyproekt is developing the design documentation for construction of a traffic ramp (a trestle bridge) from Adler new railway station to the traffic interchange called Golubye Dali (Blue Valley). |
|
10.01.2014
News from Novgorodstroyproekt: Glavgosexpertize positive conclusion is received for the Uivesh River Bridge Rehabilitation Project in Tver Region The bridge is located at 144+850 km of the regional public highway Tver –– Ustyuzhina. |
|
09.01.2014
New section of Kurortny Prospect backup road in Sochi is open The new section that was open for traffic includes Stage II and a part of Stage III. |
|
30.12.2013
Stroyproekt have studied the problem of spiked tyres application in various Russian regions Asphalt rutting due to use of spiked tyres is now extensively discussed by Russian road experts. Spiked tyres are one of the main reasons of road rutting; however until recently there have not been any regular data on how often spiked tyres are used in various regions of Russia. |
|
24.12.2013
News from Institute Proektmostorekonstruktsia: a positive expert conclusion for design of overpass in Samara Region received The State Expertise Authority has given a positive expert conclusion for the design of a new overpass at 960 km of the M-5 Ural motorway from Moscow to Chelyabinsk. |
|
18.12.2013
Unique transport interchange presented in Krasnodar city Tatyana Kuznetsova, Deputy Technical Director of Institute Stroyproekt, presented design solutions for construction of a transport interchange at the intersection of Stavropolskaya and Starokubanskaya Streets in Krasnodar city. |
|
13.12.2013
Stroyproekt arranges the third training course for former graduates The graduates that have recently joined the company will attend lectures and workshops on various professional aspects. |
|