News of Engineering group

Stroyproekt have studied the problem of spiked tyres application in various Russian regions 30.12.2013 Stroyproekt have studied the problem of spiked tyres application in various Russian regions

Asphalt rutting due to use of spiked tyres is now extensively discussed by Russian road experts. Spiked tyres are one of the main reasons of road rutting; however until recently there have not been any regular data on how often spiked tyres are used in various regions of Russia.
 
News from Institute Proektmostorekonstruktsia: a positive expert conclusion for design of overpass in Samara Region received 24.12.2013 News from Institute Proektmostorekonstruktsia: a positive expert conclusion for design of overpass in Samara Region received

The State Expertise Authority has given a positive expert conclusion for the design of a new overpass at 960 km of the M-5 Ural motorway from Moscow to Chelyabinsk.  
 
Unique transport interchange presented in Krasnodar city 18.12.2013 Unique transport interchange presented in Krasnodar city

Tatyana Kuznetsova, Deputy Technical Director of Institute Stroyproekt, presented design solutions for construction of a transport interchange at the intersection of Stavropolskaya and Starokubanskaya Streets in Krasnodar city.
 
Stroyproekt arranges the third training course for former graduates 13.12.2013 Stroyproekt arranges the third training course for former graduates

The graduates that have recently joined the company will attend lectures and workshops on various professional aspects.
 
New name for the bridge across the Ob River in Novosibirsk 05.12.2013 New name for the bridge across the Ob River in Novosibirsk

On 03 December 2013 the city designation commission of Novosibirsk decided on the name for the new bridge across the Ob River which is now under construction. The bridge name will be Bugrinsky Bridge.
 
Adygeya: a new project 04.12.2013 Adygeya: a new project

JSC Institute Stroyproekt has won the open tender for development of design documentation for rehabilitation of Р-217 “Caucasus” Motorway section connecting the M-4 Don federal highway with the Russian- Azerbaijani border and passing through Vladikavkaz, Grozny and Makhachkala.
 
Launching of the 3rd Ob River Bridge in Novosibirsk has started 03.12.2013 Launching of the 3rd Ob River Bridge in Novosibirsk has started

The first 2 meters of the bridge arch have been launched in presence of Mr. Levitin,  Aide to the Russian President , Mr. Yurchenko, Governor of Novosibirsk  Region, Mr. Koshkin, President of JSC Sibmost, Mr. Zhurbin and Mr. Surovtsev, Directors of Stroyproekt, and Mr. Devichinsky, Head of Design Department Stroyproekt.
 
Stroyproekt takes part in KazAvtoDor-2013 Exhibition 29.11.2013 Stroyproekt takes part in KazAvtoDor-2013 Exhibition

The 10th jubilee KazAvtoDor Exhibition was held in Astana on 27 November 2013 under the auspices of the Ministry of Transport and Communications of the Republic of Kazakhstan.
 
New Project in the south of Russia 28.11.2013 New Project in the south of Russia

Stroyproekt has won the tender for development of design and detailed design for construction of a new traffic interchange in Krasnodar.
 
Stroyproekt participates in the 6th Conference for Application of Innovation Methods and Materials in the Road Sector 27.11.2013 Stroyproekt participates in the 6th Conference for Application of Innovation Methods and Materials in the Road Sector

Alexey Zhurbin, General Director of Stroyproekt, and Oleg Kaschenko, Head of Marketing Department, have presented their reports at the Conference.
 

Pages: Prev. 1 ... 27 28 29 30 31 32 Next All