Stroyproekt wins the tender for design of the WHSD link to the planned East-West Highway

Stroyproekt wins the tender for design of the WHSD link to the planned East-West Highway 30.04.2019

Stroyproekt has won the public tender for development of design documentation and cost estimates for the project “Connection of the Western High Speed Diameter to the East-West Highway and construction of a new traffic interchange with Vitebsky Prospekt in St. Petersburg”.

Stroyproekt is a lead partner of the bidder, the other partner is Institute Gyprostroymost St. Petersburg.

The planned link will start at the WHSD interchange with Blagodatnaya st. and run through Kirovsky, Moskovsky and Frunzensky districts to the interchange with Vitebsky Prospekt.
The project is intended to provide a vital link between distant southern and eastern districts and to the city centre, diverting transit traffic to the highway network.
The assignment requires designing a tolling system, a control centre, and road infrastructure, and toll plaza utilities as well.

The project client is Western High Speed Diameter JCS.

Congratulations to Stroyproekt Engineering Group!



 

Related projects

Western High Speed Diameter (WHSD) Western High Speed Diameter (WHSD)

WHSD is the first urban toll expressway in St. Petersburg, 46.6 km in length, which comprises a great number of complex engineering structures. The road links the southern and western city districts with the Ring Road, Vasilievsky Island in the center and the Scandinavia highway in the north, and has improved accessibility of the main transport hubs — Pulkovo Airport, the port of St. Petersburg and the Marine Façade passenger terminal. The new expressway has reduced travel times in some city areas by 50-70%.


 
 

Возврат к списку