Novosibirsk | Ob River Crossing – Bugrinsky Bridge in Novosibirsk |
Sochi. | Back-up of Kurortny Prospect, 3 stage |
The WHSD Central Section is the most complicated part of the road. It includes unique bridge structures that will form up St. Petersburg Sea Façade:
• Double deck bridge over the city main fairway – the Sea Channel
– length: 734 m
– central span: 168 m long
– bridge underclearance: 52 m
• Cable-stayed bridge over Korabelny Fairway
– length: 620 m
– central span: 320 m long
– bridge underclearance: 35 m
• Cable-stayed bridge over Petrovsky Fairway
– length: 580 m
– central span: 220 m long
– bridge underclearance: 25 m
Layout of the WHSD Construction Stage IV
The photos by press service of Northern Capital Highway LLC
Western High Speed Diameter (WHSD) WHSD is the first urban toll expressway in St. Petersburg, 46.6 km in length, which comprises a great number of complex engineering structures. The road links the southern and western city districts with the Ring Road, Vasilievsky Island in the center and the Scandinavia highway in the north, and has improved accessibility of the main transport hubs — Pulkovo Airport, the port of St. Petersburg and the Marine Façade passenger terminal. The new expressway has reduced travel times in some city areas by 50-70%.
|
|
|