News from Institute Proektmostorekonstruktsia: Bridge across the Sura River in Ulyanovsk Region has been commissioned

News from Institute Proektmostorekonstruktsia: Bridge across the Sura River in Ulyanovsk Region has been commissioned 03.02.2014

The bridge is located at 111+630 km of the 1Р–178 motor road Saransk – Ulyanovsk.
Commissioning of the bridge took place on 25 December 2013.
The bridge main parameters:
Length: 365.13 m;
Width: carriageway 11.5+2 sidewalks х 1.0 m;    
The Sura riverbed is spanned with a composite continuous deck, the deck layout is 45.5+66.0+45.5 m; while the flood plain is bridged with a composite continuous deck (45.5+2х45.0+45.5 m) and with a reinforced concrete deck of 18 m long beams.
The length of the rehabilitated road section including the new bridge across the Sura River is 5.1 km.

Institute Proektmostorekonstruktsia has developed the bridge design.
Client: Nizhny Novgorod – Ufa Motor Road Directorate of Federal Road Agency.

Chief Project Engineers of Institute Proektmostorekonstruktsia got honorary awards for their contribution to the bridge design and construction from the Regional Administration.



Photos

Возврат к списку