Traffic Interchange at the Intersection of Donskaya and Vinogradnaya Streets

Traffic Interchange at the Intersection of Donskaya and Vinogradnaya Streets

Sochi (new construction)
Design, Detail Design Development, Construction Supervision
Project period: 2009 – 2013
General Designer: Institute Stroyproekt JSC
Client: Federal Highway Agency Directorate for Construction and Reconstruction of Motor Roads of the Black Sea Coast


A two-level interchange at 174 km of M-24 highway (from Dzhubga to Sochi).

Main technical parameters:
 – length of the mainway overpass: 294 m
 – number of lanes in main direction: 2
 – total length of engineering structures: 1,957 m.

The interchange was opened for traffic on 25 March 2013.



<

 