Novosibirsk | Ob River Crossing – Bugrinsky Bridge in Novosibirsk |
Sochi. | Back-up of Kurortny Prospect, 3 stage |
Sochi (new construction)
Design, Detail Design Development, Construction Supervision
Project period: 2009 –
2013
General Designer: Institute Stroyproekt JSC
Client: Federal Highway Agency Directorate for Construction and Reconstruction of Motor Roads of the Black Sea Coast
A two-level interchange at 174 km of M-24 highway (from Dzhubga to Sochi).
Main technical parameters:
– length of the mainway overpass: 294 m
– number of lanes in main direction: 2
– total length of engineering structures: 1,957 m.
The interchange was opened for traffic on 25 March 2013.