Novosibirsk | Ob River Crossing – Bugrinsky Bridge in Novosibirsk |
Sochi. | Back-up of Kurortny Prospect, 3 stage |
Sochi (new construction)
Design, Detail Design Development, Construction Supervision
Project period: 2009 –
2013
General Designer: Institute Stroyproekt JSC
Client: Federal Highway Agency Directorate for Construction and Reconstruction of Motor Roads of the Black Sea Coast
This is a two-level traffic interchange at the intersection of Kurortny Prospect and the 20th Mountain Division Street.
Main technical parameters of the traffic interchange:
– the length of the mainway overpass: 90.1 m
– number of lanes in main direction: 4
– total length of engineering structures: 415 m.
On April 27 the interchange was opened for traffic.