Moscow – St. Petersburg Toll Express Motorway

Moscow – St. Petersburg Toll Express Motorway

Moscow, Tver, Novgorod and Leningrad Regions and St. Petersburg (new construction)
Design, Detail Design Development, Construction Supervision
Project period: 2008 – Present
Client: GK Autodor; the Concessioner for Section 15 km – 58 km: North-West Concession Company, LLC


A new toll expressway between two capitals will be a backup of the congested M-10 motorway. The road will bypass all populated areas. 

Main parameters:
 - 1-A road category; in some sections it will be of 1-B category
 - number of lanes: 4 - 6

Section 390 km –543 km:
 - number of lanes is 4
 - number of bridges, overpasses and flyovers: 68, including 49 bridges, overpasses and flyovers along the main way, 6 overpasses at the traffic interchanges and 13 overpasses at municipal and forestry roads.

Bridge across the Msta River: 
 - bridge length is 386 m;
 - central span length is 75 m;
 - underclearance is 60 x 9.5 m.

Bridge across the Volkhov River: 
 - bridge length is 868 m;
 - central span length is 91.5 m + 91.5 m;
 - underclearance is 2 х (80 х 13.5) m.

Section 15 km– 58 km:
 - 1-A category;
 - number of lanes is 10 (15 km – 36 km) and 8 (36 km – 58 km)

The section comprises 7 traffic interchanges as well as 37 bridges and flyovers.

Construction of the road section between 15 km and 58 km will be realised on the basis of Public-Private Partnership agreement. Stroyproekt is developing working drawings with due account of international experience and requirements set by foreign partners (French Group Vinci, a partner of concession SZKK, LLC; French company Setec, the Concessioner consultant, etc.).

Extrados Bridge across the Volga River in the Tver Region:
 - bridge length: 1109 m;
 - river span length: 368 m;
 - underclearance is 140 x 17 m.

Stroyproekt has been developing the design of large-scale and non-standard bridges, overpasses and flyovers that are part of the Toll Express Motorway Project (a total of 130 facilities).
Stroyproekt is the General Designer for development of the detailed design for Section 15 km – 58 km and is a developer of a complex design for Section 334 km – 543 km.

Moscow – St. Petersburg Toll Express Motorway scheme:


  СПАД_трасса2.JPG









Photo Report on Construction of Express Toll Highway Moscow-St. Petersburg, Stage 4 14.09.2017 Photo Report on Construction of Express Toll Highway Moscow-St. Petersburg, Stage 4

A 50-km road section from km 208 to km 258 is being constructed in Tver Region. All 26 engineering structures that are part of the road are close to completion.

 
 
Stroyproekt goes on designing the express toll highway Moscow – St. Petersburg 11.11.2016 Stroyproekt goes on designing the express toll highway Moscow – St. Petersburg

Stroyproekt has signed a detailed design contract for the road section km 58 – km 97.

 
 
Photo Report on Moscow – St. Petersburg highway section 15km – 58km opening ceremony 24.12.2014 Photo Report on Moscow – St. Petersburg highway section 15km – 58km opening ceremony

 
 
New section of M-11 Moscow – St. Petersburg highway is open 23.12.2014 New section of M-11 Moscow – St. Petersburg highway is open

Moscow Sergey Sobyanin, Governor of Moscow Region Andrey Vorobyov, Boar Chairman Avtodor Sergey Kelbakh, General Director Stroyproekt Alexey Zhurbin, Director of Stroyproekt Moscow Branch  Alexander Kusik and Chief Engineer of Stroyproekt Moscow Branch Alexander Krainik. 

 
 
The First Section of Moscow-St. Petersburg Toll Express Motorway Opened 02.12.2014 The First Section of Moscow-St. Petersburg Toll Express Motorway Opened

The four-lane motorway is intended to divert transit flows from 70 populated centers and create conditions for economic growth in the areas adjacent to the road.
 
 

 

Возврат к списку